|
 | ELEVATION CHAMBER
Manufacturing characteristics:
Manufactured from polyethylene
Maximum capacity 500 liters
Work capacity 250 liters
To place an elevation bomb
| Applications
To locate before the treatment plant, when the last chamber is submerged, allowing to raise the waters and to take them to a point of evacuation for gravity.
To extract sewage from an underground. If a bath was constructed in an underground and the sewer system is over the level of your bath, place an elevation tank and an elevation bomb to raise the water to a point of evacuation.
For the last chamber, located under the sewer matrix. If the last chamber of your house was constructed under the sewer system’s level, place an elevation tank to reach the entry of the system
Capacity
Length: 1060 mm Width: 700 mm Height: 810 mm Maximum load 250 liters
|

|
|